Replacement of any part of the Electric Submersible Pump (ESP) following a failure requires a workover rig which is very expensive specially in offshore locations. The process of ESP installation and recovery can be speeded up and made more efficient by installing the ESP at the end of a coiled tubing or depoyed by cable like CDESP. Other solution is to replace ESP with Jet Pump.
This course is designed for users already familiar with the first level of Integration within IPM (GAP, PROSPER and MBAL) and wish to take the integrated production modelling approach to the next level, integrating numerical simulation reservoir models, process models, economics as well as implementing Global Optimization and Field Management Rules within the system.
Engineers and other personnel involved with the daily operation and management of producing oil and gas wells; Drilling engineers and workover engineers